Sign In | Join Free | My gastesters.com |
|
Brand Name : XHYC
Certification : ISO9001,ISO14001,ISO45001
Place of Origin : SICHUAN,CHINA
MOQ : 1 Piece
Payment Terms : L/C,T/T,Western Union,MoneyGram
Supply Ability : 500 Pieces Per Year
Delivery Time : 45-60D
Packaging Details : Wooden Box/ Container
Product Name : Muara Jawa, Indonesia 2 × 27.5 MW Coal-Fired Power Plant – Belt Conveyor Solutions
Application : Construction, Metallurgy, Mining, quarry, Ore Stone
Warranty : 1 Year
Customization : Available
Factory Visit : Welcomed Warmly
Machinery Test : Provided
Video Outgoing-Inspection : Provided
HS Code : 84742010
Muara Jawa, Indonesia 2 × 27.5 MW Coal-Fired Power Plant – Belt Conveyor Solutions
Reliable • Efficient • International Standard
8 Belt Conveyors | Belt Widths: 500 mm & 800 mm | Total Conveying Length: 1,067 m
1️⃣ High-Quality Belt Conveyors
A total of 8 conveyors supplied for the power plant project.
Belt widths of 500 mm and 800 mm to accommodate different material flows.
2️⃣ Long-Distance Conveying
Total conveyor line length of 1,067 meters.
Designed for smooth and efficient bulk material transport.
3️⃣ International Compliance & Safety
Equipment fully meets international power plant construction standards.
Ensures safe and reliable operation under continuous service conditions.
4️⃣ Versatile & Robust Design
Suitable for coal handling and power plant material transport.
High reliability and low maintenance requirements.
Parameter | Value |
---|---|
Number of Conveyors | 8 |
Belt Width | 500 mm & 800 mm |
Total Conveying Length | 1,067 m |
Application | Coal handling for power plant |
Compliance | International power plant standards |
Coal handling and transportation in power plants
Integration into international-standard power plant facilities
Long-distance and continuous bulk material transport
Request a Quote or Contact Us for More Information Today!
![]() |
Muara Jawa, Indonesia 2 × 27.5 MW Coal-Fired Power Plant – Belt Conveyor Solutions Images |